what we did:
This week our group went to the mill down Mill road. Eva and I had to go on a journey into the stream to do water testing. We found out that the stream is too slow for our plan.
some of our results from water testing where
- Clarity was 30 cm of visibility
- The stream bed was made up off rocks,mud.weeds and rubbish
- The water temp was 16.6 inside the water.
- The flow was slow taking 2.20 minutes travailing 3 meters.
We also talked to Mr Thorn about getting a hydro generator and we saw how it works.
No comments:
Post a Comment